The situation
By the time Hyun-woo and Feng called our office, they were already shouting at each other in the parking lot of the sandwich shop they thought they were about to own, and the seller had stopped answering Feng's calls entirely. A construction lien had appeared against the leased premises days earlier, filed by a contractor who claimed the outgoing franchise owner, Zhen, had never fully paid for renovation work done the previous year. Nobody had mentioned it before the deposit went down.
Hyun-woo worked as a personal support worker and Feng as a forklift operator, and between them they had spent years putting aside a modest sum, in the low six figures, toward finally owning something of their own rather than working for someone else. A franchise resale had seemed like the safer route into business ownership: an existing location, trained staff, a proven format. They had put down a deposit against the purchase price, in the range of two hundred thousand dollars all in, and had already given notice at their jobs, expecting to take over the business within a matter of weeks. Like many first-time buyers moving quickly on a franchise resale, they had treated the franchisor's own approval of the transfer as a kind of informal seal of quality, not realizing that a franchisor signing off on a new operator says nothing about whether the underlying premises are free of claims that could stall or derail the sale entirely.
The lien changed everything. Under Ontario's construction lien rules, an unpaid contractor can register a claim against the land, but only against whatever interest in that land belonged to the party who ordered the work — since Zhen held the premises as a tenant rather than an owner, the lien attached to the leasehold rather than to any ownership interest of the landlord, unless the landlord's own interest was somehow caught up in the claim. It is also a short-lived right: the contractor has to register within a strict deadline running from their last supply of services or materials, and the claim expires if that deadline is missed. Because the sandwich shop operated out of leased space, the lien still clouded the transferability of the lease and gave the landlord grounds to pause any assignment of the tenancy until the dispute was resolved.
Zhen insisted the contractor had been paid in full and that the lien was retaliation for a separate disagreement about the quality of the work. The contractor, for his part, was not backing down. Hyun-woo and Feng, who had never dealt with anything like this before, assumed the worst: that Zhen had lied to them, that their deposit was gone, and that months of saving had been wasted on a business they might never get to run. That assumption, more than the lien itself, was what had brought the shouting into the parking lot.
Where it went wrong
The lien itself was a fairly ordinary commercial dispute, the kind that happens when a contractor and a business owner disagree about whether work was completed to standard or paid in full. What made it dangerous for Hyun-woo and Feng was the timing and the way it collided with a deal that had already moved past the point where a buyer could simply walk away without cost.
Their purchase agreement, negotiated without legal review before our office was retained, did not include a clear condition requiring the premises to be free of liens or encumbrances before closing. It assumed a clean title and a straightforward lease assignment, because nobody involved in drafting it had anticipated a dispute of this kind surfacing midstream. When the lien appeared, there was no built-in mechanism in the agreement telling either side what should happen next, which left Hyun-woo and Feng exposed and, worse, left them without a clear answer about whether their deposit was actually at risk. A basic clause requiring the seller to deliver the premises free of liens and encumbrances before closing, standard in almost any purchase agreement drafted with legal advice, would have given them a contractual right to pause closing or recover their deposit the moment the lien surfaced, instead of leaving them to guess at their own exposure while emotions took over.
Zhen's own conduct made things worse before it made them better. Rather than disclosing the dispute with the contractor as soon as it began, months before the sale, Zhen had hoped it would resolve quietly and never come up. When it surfaced instead, at the worst possible moment, Zhen's instinct was to minimize it, which read to Hyun-woo and Feng as dishonesty rather than poor judgment, and the relationship between buyer and seller, already thin, broke down almost immediately.
The landlord's position added a further complication. Commercial landlords are generally entitled to withhold consent to a lease assignment where there is an unresolved claim clouding the tenant's standing, and this landlord made clear that any assignment to Hyun-woo and Feng would wait until the lien was dealt with, regardless of how the buyer and seller sorted out their side of the dispute. That put a second, independent obstacle in the path of a closing that was already in trouble. A consent right like this exists specifically so a landlord is not forced to accept a new tenant into a unit while a financial dispute tied to that same space remains unresolved, and it operates on its own timeline regardless of anything the buyer and seller privately agree between themselves.
By the time we were called, Hyun-woo and Feng were treating the lien as proof the whole deal was compromised, Zhen was treating their reaction as an overreaction, and nobody was speaking to the landlord at all.
What we did
- Separated the emotional breakdown from the legal problem. Before any legal step could work, we needed Hyun-woo and Feng to stop treating every development as proof the deal was doomed, so we sat with them and walked through what a construction lien actually is and is not, in plain terms, which lowered the temperature enough that they agreed to let the legal process run its course instead of demanding their deposit back that same week.
- Reviewed the lien claim and the underlying contractor dispute in detail. We obtained the registered lien documents and the contractor's original invoices to understand the actual amount genuinely in dispute, which turned out to be a specific, bounded figure in the low tens of thousands rather than an open-ended or exaggerated claim, giving everyone involved a realistic sense of what it would actually take to resolve rather than a worst-case guess.
- Opened a direct, calm channel with Zhen's lawyer instead of Zhen personally. Rather than letting Hyun-woo and Feng continue dealing with Zhen directly, where every conversation had degraded into an argument about honesty and blame, we routed communication through counsel on both sides, which let the underlying facts move forward without the personal history attached to them getting in the way of a workable resolution.
- Negotiated a holdback from the sale proceeds to secure the lien amount. Instead of waiting for Zhen and the contractor to fully resolve their separate dispute before closing could proceed at all, we arranged for a sum equal to the disputed amount, plus a reasonable margin, to be held back from what Zhen would receive at closing and used to satisfy or bond off the lien, which let the transaction move forward without either side having to simply trust the other's good faith.
- Coordinated with the landlord to restart the stalled assignment approval. Once the lien had a clear, funded path to resolution through the holdback arrangement, we went back to the landlord's counsel with evidence that the premises would shortly be clear of any claim, which was enough to get the lease assignment process moving again after it had stalled out completely over the prior two weeks.
- Amended the purchase agreement to reflect the real risk everyone now understood. We added a specific clause addressing the lien and the holdback mechanism directly, spelling out the amount to be withheld, the conditions for its release, and what would happen if the contractor dispute was not resolved by closing, so the transaction no longer depended on an informal understanding between two parties barely speaking to each other outside of counsel. Putting it in writing gave both sides a document to rely on instead of a conversation neither fully trusted.
- Closed with the lien formally discharged from the holdback funds. Once the contractor accepted payment from the held-back proceeds in full satisfaction of the claim, we confirmed the lien was formally discharged from title rather than relying on the contractor's word alone, since an undischarged lien can continue to cloud a property's record even after payment. With that confirmation in hand, the landlord approved the assignment and the sale closed roughly five weeks later than originally planned, with Hyun-woo and Feng finally taking possession.
- Debriefed the couple on what the delay had actually cost. We walked Hyun-woo and Feng through the final numbers, so they understood clearly what had been protected, what had been spent, and why the outcome, while delayed and stressful, had not put their original deposit or savings at the risk they had feared during the worst of it. Closing that loop mattered, because the couple had spent weeks assuming the worst, and seeing the actual figures in writing settled their nerves more than any verbal reassurance had managed.
The outcome
Hyun-woo and Feng got the business, but not on the timeline or the terms they had originally expected, and the delay cost them real money. Both had already given notice at their jobs, expecting to start within weeks, and instead spent over a month without income from either their old work or the new business while the lien was sorted out, drawing down savings they had meant to keep in reserve for the first lean months of ownership. That gap cost them several thousand dollars in lost wages and rent they still owed on their apartment while they waited, money that had never been part of their original budget for taking over the shop.
The financial resolution itself was contained. The holdback covered the disputed contractor claim in full, and Zhen absorbed the cost of the delay and the discounted amount ultimately paid to settle the lien, rather than Hyun-woo and Feng's deposit being put at risk. Nobody walked away from this with everything they wanted. Zhen's own carelessness in not disclosing the dispute earlier cost real trust and, eventually, a chunk of the sale proceeds.
The deeper cost was not financial. Hyun-woo and Feng went into business ownership already exhausted by a dispute that should never have reached the parking-lot stage, and the relationship with Zhen, who stayed on briefly to help with the transition, never fully recovered from those first weeks. Feng later said the worst part of the ordeal was not any single legal setback but the days when nobody was speaking to anybody, and that having a lawyer simply pick up the phone and talk calmly to Zhen's counsel had done more to save the deal than any document that was eventually signed. The lesson they took from it, one they repeated to us more than once, was that they should have had someone review the deal before the deposit went down, not after a lien forced the issue.
What you can learn from this
- Have a purchase agreement reviewed before your deposit goes down, not after a problem surfaces — a basic condition requiring clean title and an unencumbered premises would have given Hyun-woo and Feng a clear path instead of a crisis.
- A construction lien against leased premises is usually a bounded, resolvable dispute over a specific dollar amount, not proof the whole transaction is compromised, but you need someone to confirm that quickly rather than assuming the worst.
- If you are selling a business and know of an unresolved dispute with a contractor or supplier, disclose it early — surfacing it late almost always costs more in trust and money than surfacing it honestly from the start would have.
- A commercial landlord's consent to a lease assignment is a separate obstacle from any dispute between buyer and seller, and needs its own line of communication rather than being left to resolve itself once the underlying issue is fixed.
- When a deal turns emotional, get a professional between the parties before positions harden further — de-escalation is often the precondition for any legal fix to actually work, not a separate step you can skip.
This is a buying & selling a business problem we handle
Start a file online — flat, published fees, reviewed by a licensed lawyer before a dollar is owed.