- A building permit is generally needed to build a new structure over 10 square metres, add to a building, or install, alter or repair a septic system.
- Building without a required permit is an offence under the Building Code Act, 1992, and in unorganized territory permits are not available but the Ontario Building Code still applies.
- Zoning approval, and sometimes conservation authority approval, can be needed before a permit is issued, so check the paper trail for each building and the septic system.
A boat-access cottage often comes with extras: a bunkie for guests, an addition built years ago, a storage shed, and a septic system nobody remembers installing. Sellers may say everything was done long ago, but that does not tell you whether it was built lawfully.
This page helps you work out what permits could have applied to each building and system, who would have issued them, and what questions to ask before you close. Rules differ by location and by the date of the work, so a lawyer can confirm how they apply to your property.
Why unpermitted work matters when you buy
A municipal building permit is generally needed before you build a new structure over 10 square metres, add to or renovate a building, change its use, excavate or lay a foundation, or install, alter or repair an on-site sewage (septic) system. A shed needs no permit under section 8 of the Building Code Act if it is no more than 15 m² in gross area, one storey or less, not attached to any building or structure, used only for storage accessory to a principal building on the lot, and has no plumbing. Permits come from the municipality's building department.
Building without a required permit is an offence under the Building Code Act, 1992. Fines for an individual can be up to $50,000 for a first offence and up to $100,000 for later offences. Who is responsible when the work was done by a previous owner depends on your situation, so it is worth raising it before you buy rather than after.
Go building by building
| Item | What to check |
|---|---|
| Addition or renovation | Was a building permit issued, and was the work inspected? |
| Bunkie | A cabin does not qualify for the small-shed exemption, so ask about a permit. |
| Shed | May need no permit only if it meets every listed condition. |
| Septic system | Every installation, repair or upgrade needs a permit and an inspection. |
The small-shed exemption is narrow. Under the 2024 Building Code, a shed needs no permit if it is no more than 15 m² in gross area, one storey or less, not attached to any building or structure, used only for storage accessory to a principal building on the lot, and has no plumbing. A cabin, or a shed on vacant land with no principal building, does not qualify. Even an exempt shed must still respect municipal by-laws and zoning, such as setbacks.
Zoning and conservation authority approvals
Zoning is applicable law for a building permit, so if a project needs a zoning change or a minor variance, no permit will be issued until that approval is obtained. Conservation authority or heritage approvals may also be needed.
A conservation authority permit is needed for development and some other activities in regulated areas, including floodplains, shorelines, wetlands and watercourses. Many cottages sit close to water, so ask whether a bunkie or addition was built in a regulated area and whether a conservation authority permit was obtained. Where the area is regulated is set by the authority, so ask it directly.
Septic systems and unorganized territory
Part 8 of the Building Code governs septic systems with a design flow of up to 10,000 litres per day. The local municipality usually enforces it, but in some areas a board of health or conservation authority does. Ask who administers it for your lot.
- A septic treatment unit must be at least 15 m from a well and 15 m from a lake, river, stream, pond or reservoir, and at least 3 m from a property line.
- Distribution piping must be 15 m from those waters and 30 m from a well, and at least 3 m from a property line.
- For a well with a watertight casing to a depth of at least 6 m, distribution piping or leaching chambers need only 5 m from the well.
- Tanks must be cleaned whenever sludge and scum fill one-third of the working capacity.
Older systems may have been built before these distances applied, or without a permit. Building permits and inspections are not available in unincorporated areas, but every building there must still comply with the Ontario Building Code. In that case there may be no permit record at all, so an independent inspection of the buildings and septic system becomes more important.
What to do next
- List every building and the septic system, and ask the seller when each was built or installed.
- Request copies of building permits, inspection records and septic permits from the seller, then confirm with the municipality's building department.
- Ask whether the property is in a municipality or unorganized territory, since permits are not available in unincorporated areas.
- Ask the conservation authority whether any structure is in a regulated area.
- Have the septic system inspected and ask where the well and water are in relation to it.
- Ask your lawyer about conditions in the agreement, such as a seller's promise about permits or a price adjustment.
If a permit was refused, technical Building Code issues can be appealed to the Building Code Commission, and other legal issues, such as how zoning is interpreted, go to a judge of the Superior Court of Justice. A lawyer can explain which route fits your situation.
Frequently asked questions
Does a bunkie need a building permit in Ontario?
It depends on its size, use and features. The small-shed exemption does not apply to a cabin, and a bunkie used for sleeping would not be storage only. A new structure over 10 square metres generally needs a permit. Confirm with the local building department.
Can I get a building permit in unorganized territory?
No. Building permits and inspections are not available in unincorporated areas, but every building there must still comply with the Ontario Building Code.
Does every septic repair need a permit?
Every septic installation, repair or upgrade needs a permit and must be inspected. Alterations and repairs are also listed among the work needing a municipal building permit.
Can a conservation authority permit replace a building permit?
Not generally. They are separate approvals, and conservation authority or heritage approvals may be needed in addition to the building permit. A conservation authority permit is needed for development in regulated areas such as floodplains, shorelines and wetlands.
Sources
- Ontario Citizen's Guide to Land Use Planning – Building permits — ontario.ca
- 2024 Building Code Compendium – Division C, Part 1 — ontario.ca
- MMAH Bulletin – Off-Grid Development in Unincorporated Areas — ero.ontario.ca
- 2024 Building Code Compendium – Part 8 Sewage Systems — ontario.ca
- OMAFRA SepticSmart! Understanding Your Home's Wastewater System — ontario.ca
- Ontario – Permits under the Conservation Authorities Act — ontario.ca
Links go to official government, court and regulator pages. The law changes — confirm you are reading the current version.
This is a real estate question
Start a file online — flat, published fees, reviewed by a licensed lawyer before a dollar is owed.