TREADSTONE LAW · ONTARIO · DIGITAL LEGAL SERVICES · EST. MMXXI ·TSL
Licensed by the Law Society of OntarioFlat fees published upfrontWe reply to messages within 1 business daySign in
№ 22 Real Estate

British Columbia Small-Scale Multi-Unit Housing (SSMUH) Rules

Which British Columbia lots qualify for SSMUH zoning, how many units are allowed, the exemptions, and what municipalities can still regulate.

Real Estate5 min readTSLBy the Treadstone Law Team · British ColumbiaUpdated November 1, 2026
← All articles
Key takeaways
  • Zoning for single-family and duplex lots must now allow more units, generally 3 or 4 on qualifying lots and up to 6 near frequent transit.
  • Exemptions include lots without municipal water or sewer, very large lots and certain heritage land.
  • Municipalities keep some regulatory powers, but cannot use them to unreasonably restrict the required units.

You may have heard that the Province changed zoning so that more homes can be built on lots that used to allow only a single house. These changes are known as small-scale multi-unit housing, or SSMUH. How they apply depends on where your lot is and how it is zoned.

This article explains in plain terms which lots qualify, how many units are allowed, which exemptions exist, and what your municipality can still control. Zoning varies by place, so use this as a map rather than a final answer for your lot.

This article covers the law of British Columbia.

What the SSMUH rules require

Under the Local Government Act, a local government zoning bylaw must permit the housing uses and densities set out in section 481.3 by June 30, 2026, unless an exemption in section 481.4 or the regulations applies. The rules apply to "restricted zones". After the 2025 changes in Bill 25, a zone where any parcel is restricted to duplexes and/or a single detached home is a Restricted Zone that must meet the minimum unit densities on all lots. The definition now includes lots where a single detached home with a secondary suite and detached accessory dwelling unit is allowed.

The June 30, 2026 date has passed. Local governments had to update their bylaws by then unless they applied for an extension. Some are still adopting bylaws, so check your municipality's current zoning.

How many units are allowed

The requirement works in layers. In every restricted zone, the bylaw must permit at least one additional unit within the detached dwelling and/or at least one in another building on the same parcel. Larger municipalities and areas inside an urban containment boundary must permit a higher prescribed number, with a higher minimum again near a qualifying bus stop on parcels of a prescribed size. The Province's summary of those numbers is below.

Lot situationUnits required
Single-family or duplex lot of 280 m² or smaller, inside an urban containment boundary or in a municipality over 5,000 peopleAt least 3 units
The same kind of lot larger than 280 m²At least 4 units
Lot larger than 280 m² in a municipality or regional district of at least 5,000 people, near a frequent transit bus stopUp to 6 units

"Frequent transit" means a route with a bus at least every 15 minutes on average, from 7 a.m. to 7 p.m. Monday to Friday and 10 a.m. to 6 p.m. on Saturday and Sunday. The required use and density apply only where residential use is permitted on the parcel.

Exemptions that may apply to your lot

A local government that relies on one of these exemptions must give the minister written notice identifying the land and the exemption used. The Province's page also notes that other exemptions may apply, so ask your municipality which category your lot is in.

What municipalities can still regulate

Municipalities still set many details, but with limits. Their development permit area designations and land use regulation powers must not be used in a way that unreasonably prohibits or restricts the use or density required. A zoning bylaw must not use conditional density rules, such as amenity-based density bonuses, to achieve the minimum units. Limited conditions are allowed on only one of the section 481.3(5) units, and on units above the minimum.

Where provincial regulations set siting, size, form or density standards, the local government must follow them and must consider provincial guidelines. A development permit generally cannot vary permitted use or density, except for hazard-related conditions tied to health, safety or protection of property. A local government also cannot hold a public hearing on a zoning bylaw whose sole purpose is complying with these rules; notice is required instead. Specific height, setback and parking limits differ by municipality, so read your local bylaw.

What to do next

Being permitted to build is not an obligation to build, and it does not replace permits. Building permits, development cost charges and any development permit still apply separately.

Frequently asked questions

Has the SSMUH deadline passed?

The June 30, 2026 deadline for updating bylaws has passed. Some local governments applied for extensions or are still adopting bylaws, so check your municipality's current zoning rather than assuming the rules are in place.

Can I build six units on any lot?

No. Up to six units applies to lots larger than 280 m² in a municipality or regional district of at least 5,000 people that are near a frequent transit bus stop. Exemptions such as servicing, lot size and heritage can also remove a lot from the minimum unit counts.

Do neighbours get a public hearing?

A local government must not hold a public hearing on a zoning bylaw whose sole purpose is complying with these rules. It must give notice instead.

Can my municipality still say no to my project?

It cannot use development permit or land use powers to unreasonably prohibit or restrict the required use or density. It can still require permits and apply other applicable rules, so a refusal is worth reviewing with a lawyer.

Sources

Links go to official government, court and regulator pages. The law changes — confirm you are reading the current version.

This article is general information, not legal advice. Reading it does not create a lawyer-client relationship. British Columbia laws, tax rates, and government programs change, and how the law applies depends on your specific facts. For advice about your situation, speak with a lawyer who practises in British Columbia. Reach us at 1-844-900-1070 or send our Team a message.

This is a real estate question

Ask our Team for a quote. We reply by email.

ContactStart a File →